The disaster recovery plan does not include the Sun Ray system (network infrastructure and peripherals).

From Sun Ray 4 Policy STIG

Part of DRP does not include Sun Ray system

Associated with IA controls: CODP-1, CODP-3, CODP-2

SV-17407r1_rule The disaster recovery plan does not include the Sun Ray system (network infrastructure and peripherals).

Vulnerability discussion

If the disaster recovery plan does not include the Sun Ray system, recovering from a disaster would not be possible. All peripherals and necessary equipment must be included in the disaster recovery plan to ensure a successful restoration of data, servers, and clients are possible.

Check content

Ask for a copy of the site’s Continuity of Operations Planning (COOP). Verify the Sun Ray system is specifically mentioned in the plan. Ensure the plan addresses the restoration of the Sun Ray system within 24 hours of activation of the COOP. Additionally, ensure that the Sun Ray system restoration is validated at least annually as part of the normal COOP testing process. If any of these requirements is not met, this is a finding.

Fix text

Add the Sun Ray system to the COOP.

Pro Tips

Lavender hyperlinks in small type off to the right (of CSS class id, if you view the page source) point to globally unique URIs for each document and item. Copy the link location and paste anywhere you need to talk unambiguously about these things.

You can obtain data about documents and items in other formats. Simply provide an HTTP header Accept: text/turtle or Accept: application/rdf+xml.

Powered by sagemincer