SI-13 (4)(a)

From NIST SP 800-53 Controls

SI-13_L4RLaR
SI-13 (4)(a)

The organization, if information system component failures are detected: Ensures that the standby components are successfully and transparently installed within [Assignment: organization-defined time period]; and

Pro Tips

Lavender hyperlinks in small type off to the right (of CSS class id, if you view the page source) point to globally unique URIs for each document and item. Copy the link location and paste anywhere you need to talk unambiguously about these things.

You can obtain data about documents and items in other formats. Simply provide an HTTP header Accept: text/turtle or Accept: application/rdf+xml.

Powered by sagemincer