The audit system must alert the SA when the audit storage volume approaches its capacity.

From Red Hat Enterprise Linux 5 Security Technical Implementation Guide

Part of GEN002730

Associated with IA controls: ECSC-1

Associated with: CCI-000143

SV-26518r1_rule The audit system must alert the SA when the audit storage volume approaches its capacity.

Vulnerability discussion

An accurate and current audit trail is essential for maintaining a record of system activity. If the system fails, the SA must be notified and must take prompt action to correct the problem.Minimally, the system must log this event and the SA will receive this notification during the daily system log review. If feasible, active alerting (such as e-mail or paging) should be employed consistent with the site’s established operations management systems and procedures.

Check content

Fix text

Edit /etc/audit/auditd.conf and set the space_left_action parameter to a valid setting other than "ignore". If the space_left_action parameter is set to "email" set the action_mail_acct parameter to an e-mail address for the system administrator.

Pro Tips

Lavender hyperlinks in small type off to the right (of CSS class id, if you view the page source) point to globally unique URIs for each document and item. Copy the link location and paste anywhere you need to talk unambiguously about these things.

You can obtain data about documents and items in other formats. Simply provide an HTTP header Accept: text/turtle or Accept: application/rdf+xml.

Powered by sagemincer