From Network Infrastructure Policy Security Technical Implementation Guide
Part of NET0131
Associated with: CCI-001121
Prior to establishing a connection with another activity, a Memorandum of Understanding (MOU) or Memorandum of Agreement (MOA) must be established between the two sites prior to connecting with each other.
Review the network topology and interview the ISSO to verify that each external connection to the site’s network has been validated and approved by the AO and CAO and that CAP requirements have been met. If there are any external connections that have not been validated and approved, this is a finding.
All external connections will be validated and approved prior to connection. Interview the ISSM to verify that all connections have a mission requirement and that the AO is aware of the requirement.
Lavender hyperlinks in small type off to the right (of CSS
class id
, if you view the page source) point to
globally unique URIs for each document and item. Copy the
link location and paste anywhere you need to talk
unambiguously about these things.
You can obtain data about documents and items in other
formats. Simply provide an HTTP header Accept:
text/turtle
or
Accept: application/rdf+xml
.
Powered by sagemincer