Protected Distribution System (PDS) Construction - External Suspended PDS

From Traditional Security

Part of PDS Construction - External Suspended PDS

Associated with IA controls: DCSR-3, PESS-1, ECCT-2

SV-41012r2_rule Protected Distribution System (PDS) Construction - External Suspended PDS

Vulnerability discussion

A PDS that is not constructed and configured as required could result in the undetected interception of classified information.

Check content

Exterior PDS: Check to ensure: 1. Suspended Systems between buildings are elevated a minimum of 5 meters. 2. Are only used on property that is owned or leased by the U.S. Government or contractor having control of the PDS. 3. The PDS is installed to provide unimpeded inspection and is cleared of any obstruction or device which encroaches upon the system to facilitate tampering. 4. The area containing PDS is illuminated.

Fix text

Exterior Suspended PDS: 1. Suspended Systems between buildings must be elevated a minimum of 5 meters. 2. Must only be used on property that is owned or leased by the U.S. Government or contractor having control of the PDS. 3. The PDS must be installed to provide unimpeded inspection and must be cleared of any obstruction or device which encroaches upon the system to facilitate tampering. 4. The area containing PDS must be illuminated.

Pro Tips

Lavender hyperlinks in small type off to the right (of CSS class id, if you view the page source) point to globally unique URIs for each document and item. Copy the link location and paste anywhere you need to talk unambiguously about these things.

You can obtain data about documents and items in other formats. Simply provide an HTTP header Accept: text/turtle or Accept: application/rdf+xml.

Powered by sagemincer